Just a few more details to complete this project

The hardwoods are stained and ready for foot traffic, the kitchen cabinets are installed.  We’re just waiting for countertops and the final punch list.  Maybe there will be some Halloween trick or treaters coming by at the end of the month!

One month into the rehab and it is almost finished!

This project is entering into the final stages of completion and it is coming together beautifully.  The rooms have been painted a soft color which will bring a lot of natural light inside.  Ceiling fans, light fixtures are being installed.  The tile is almost complete in the 2 bathrooms.  Check out the tile detail in the master bedroom shower.   Tell your potential buyers to check out the progress and be ready to make an offer.

Rehab Almost Done, But More To Come

Yeah! The rain came over the last few days and the sod is happy! The sheet rock is ready for paint, the windows have been trimmed out, the new doors have been hung. Check out the tile being installed in the bathroom and be the first to see the tile that will go in the master shower. Stay tuned for the final push.

Close To The Home Stretch

The crew going full speed ahead.  This morning most of the first floor had sheetrock.  The  photos upstairs show the insulation in the roof, the dormer, and the ducts.  This house will be cool in the summer and warm in the winter.  After the sheet rock is taped and prepped for paint, the house will be in the home stretch.  The front and back are ready for the installation of the landscaping.  Now we really need the rain to start.  It held off while the roof was finished but the ground is extremely dry.  Anyone know how to do a rain dance?

Major Progress In Rehab

This project is moving quickly! The concrete masons are about finished with the entry ways front and side, stairs in the front, the retaining wall by the street.  The inside has all the new windows in place, the insulation and the sheet rock is next.  Come back soon to see the progress!

Bricks, Accent Color and Inspections, Oh My!

The brick masons are finishing up the exterior, the black gutters are in place.  The accent color is different on purpose.  We are looking for feedback on the color.  What do you think?

Once the electrical and plumbing inspections are complete, the interior will take shape.  Hopefully, in a few weeks it will be ready to show.

End of Second Week of Renovation

Let it rain! The roof is on, the soffits have the accent color, the white gutters will be replaced with black gutters in a couple of days. The upstairs plumbing for the bathroom and the laundry is ready for the inspectors. The stairway has been replaced. The project is moving on entering the 3rd week!