495 Daniel Ave: Update 16

It is a glorious fall day in Atlanta.  The leaves are changing, the air is crisp.  It is Halloween and 495 Daniel Ave is having its first Open House.  Take the tour and see how inviting this house is now.  It has been brought back to life inside and out.   Notice the staging and all the quality features.  It won’t be long and a new homeowner will be moving here.

Just a few more details to complete this project

The hardwoods are stained and ready for foot traffic, the kitchen cabinets are installed.  We’re just waiting for countertops and the final punch list.  Maybe there will be some Halloween trick or treaters coming by at the end of the month!

We’re in the home stretch

It was unanimous.  The color of the soffit and the dormer in the front has been changed.  The cabinets are being installed in the kitchen and the ceiling fans and light fixtures are all in place. Check out the decorative stone work in the back yard.  In a short week or so, this house will be ready for the new buyer.  Watch for the final pictures from this fun project!

Close To The Home Stretch

The crew going full speed ahead.  This morning most of the first floor had sheetrock.  The  photos upstairs show the insulation in the roof, the dormer, and the ducts.  This house will be cool in the summer and warm in the winter.  After the sheet rock is taped and prepped for paint, the house will be in the home stretch.  The front and back are ready for the installation of the landscaping.  Now we really need the rain to start.  It held off while the roof was finished but the ground is extremely dry.  Anyone know how to do a rain dance?

Major Progress In Rehab

This project is moving quickly! The concrete masons are about finished with the entry ways front and side, stairs in the front, the retaining wall by the street.  The inside has all the new windows in place, the insulation and the sheet rock is next.  Come back soon to see the progress!

Bricks, Accent Color and Inspections, Oh My!

The brick masons are finishing up the exterior, the black gutters are in place.  The accent color is different on purpose.  We are looking for feedback on the color.  What do you think?

Once the electrical and plumbing inspections are complete, the interior will take shape.  Hopefully, in a few weeks it will be ready to show.

End of Second Week of Renovation

Let it rain! The roof is on, the soffits have the accent color, the white gutters will be replaced with black gutters in a couple of days. The upstairs plumbing for the bathroom and the laundry is ready for the inspectors. The stairway has been replaced. The project is moving on entering the 3rd week!