It is a glorious fall day in Atlanta. The leaves are changing, the air is crisp. It is Halloween and 495 Daniel Ave is having its first Open House. Take the tour and see how inviting this house is now. It has been brought back to life inside and out. Notice the staging and all the quality features. It won’t be long and a new homeowner will be moving here.
30032
495 Daniel Ave: Update 15
By October 22, the custom closets have been installed through out the house and new doors are in place. The kitchen has beautiful new granite countertops and backsplash. Next is the punch list for the final details and staging.
Just a few more details to complete this project
The hardwoods are stained and ready for foot traffic, the kitchen cabinets are installed. We’re just waiting for countertops and the final punch list. Maybe there will be some Halloween trick or treaters coming by at the end of the month!
Take a look at the interior detail today!
The floors are being sanded to prepare for the stain and finishing. There are new baseboards through out this house. Once the stain and finish are applied, no one will be walking inside for 48 hours while the finish dries.
We’re in the home stretch
It was unanimous. The color of the soffit and the dormer in the front has been changed. The cabinets are being installed in the kitchen and the ceiling fans and light fixtures are all in place. Check out the decorative stone work in the back yard. In a short week or so, this house will be ready for the new buyer. Watch for the final pictures from this fun project!
One month into the rehab and it is almost finished!
This project is entering into the final stages of completion and it is coming together beautifully. The rooms have been painted a soft color which will bring a lot of natural light inside. Ceiling fans, light fixtures are being installed. The tile is almost complete in the 2 bathrooms. Check out the tile detail in the master bedroom shower. Tell your potential buyers to check out the progress and be ready to make an offer.
It’s Beginning To Look Home
It is beginning to look like Home Sweet Home. The sod is out in front, The sheetrock is all taped and ready for paint. The windows are being trimmed out. This will be ready for buyers in a short few weeks!
Sheet Rock and HVAC Installation
The sheet rock installation is progressing well. The heating and air conditioning have been installed. Still waiting for rain!
Close To The Home Stretch
The crew going full speed ahead. This morning most of the first floor had sheetrock. The photos upstairs show the insulation in the roof, the dormer, and the ducts. This house will be cool in the summer and warm in the winter. After the sheet rock is taped and prepped for paint, the house will be in the home stretch. The front and back are ready for the installation of the landscaping. Now we really need the rain to start. It held off while the roof was finished but the ground is extremely dry. Anyone know how to do a rain dance?
Major Progress In Rehab
This project is moving quickly! The concrete masons are about finished with the entry ways front and side, stairs in the front, the retaining wall by the street. The inside has all the new windows in place, the insulation and the sheet rock is next. Come back soon to see the progress!